TraceNcode
HR • Attendance • Geofencing

Geofence Attendance& Location Tracking

Advanced geofencing with interactive map drawing, employee location restrictions, and automatic attendance validation for HR compliance.

View on Odoo Store
4.9 Rating
100+ Installs
17.0 | 18.0 | 19.0

Live Geofence Tracking

11:07:04 AM

Real-Time
Alice
✗ Outside Geofence
Bob
✓ Inside Geofence
Carol
✗ Outside Geofence
Dave
✓ Inside Geofence
Inside Zone
2
Can check in/out
Outside Zone
2
Access restricted
Real-time validation: Employees can only check in/out when inside authorized geofence zones.

Key Features

Everything you need for location-based attendance management

Interactive Map Drawing

Draw custom boundaries directly on map - circles, polygons, or rectangles. No coordinate entry needed.

Automatic Attendance Validation

Real-time location verification on check-in/out. Validates against employee's allowed geofence locations.

Multiple Geofence Support

Define unlimited geofence locations. Assign multiple locations per employee for flexible work arrangements.

Accurate Algorithms

Haversine formula for circles, ray casting for polygons. Handles Earth's curvature for precise calculations.

Compliance & Audit Trail

Complete validation history. Verify employees are at authorized worksites. Prevent location fraud.

Buffer Distance Support

Flexible boundaries with buffer zones. Configurable distance thresholds for each geofence location.

Use Cases

Perfect for any industry that needs location-based attendance

🏗️

Construction Sites

Draw exact site boundaries for multiple construction projects

🏥

Healthcare Facilities

Restrict check-ins to hospital premises and clinics

🏪

Retail Chains

Define each store's geofence across multiple locations

🔧

Field Service

Track technicians at customer locations and verify visits

🏭

Manufacturing Plants

Multiple zones within facility with zone-specific access

🏠

Remote Workers

Validate work-from-home locations for hybrid teams

Business Benefits

Prevent buddy punching and location fraud
No manual coordinate entry required
Worldwide location support
Works with any attendance system
Mobile-ready for field workers
Optimized for thousands of employees

Technical Highlights

Built with Odoo 17.0 | 18.0 | 19.0 & latest OWL framework
Leaflet.js for professional map rendering
Leaflet Draw for intuitive drawing tools
OpenStreetMap (no API keys required)
JSON-based coordinate storage
RESTful API for mobile integration

Screenshots

See the geofence attendance module in action with interactive maps and real-time validation

Geofence Map Drawing - Interactive Interface
Circle Geofence Creation
Polygon Geofence Drawing
Employee Location Assignment
Geofence Location Management
Attendance Validation View
Real-Time Location Tracking
1 / 7

Ready to Transform Your Attendance Management?

Get 10% off when you buy directly from us. Includes priority support and installation assistance.

Contact Support